Sadly the weather is so cold that it is causing delays. The weather is in the minuses and snow stays on the ground.
The heater/dehumidifier is frozen up and cannot be switched on.
The LWWP has now arrived and is installed.
The heating system has been installed and is nearly ready to be switched on. Just need the temperature to be better (next week) so that the water doesn't freeze in the pipes.




No comments:
Post a Comment